Building, Construction & Demolition Permits

TEMPORARY OPERATING PROCEDURE IN PLACE WHILE OFFICE CLOSED TO PUBLIC

Applications can be filled out and mailed in to our address posted to the right -or dropped off at the courthouse with required submittals/plans/soils tests. There is an overnight mailbox drop box located outside the front door of the government center. DROPBOX IS FOR ALL DEPARTMENTS – CLEARLY MARK OUTSIDE OF ENVELOPES WITH ENVIRONMENTAL SERVICES TO ENSURE CORRECT DELIVERY.  Staff will determine the construction value and calculate the permit fee. Plan review and processing will be completed, and the applicant will be contacted with payment amount. Payment may be mailed in, or dropped in drop box - once received permit will be mailed out.

Building permit application (for use in the townships of Amador, Chisago Lake, Fish Lake, Franconia,  Nessel, Rushseba, Shafer, and Sunrise – and the cities of Center City, Harris, Lindstrom, and Rush City) Be sure to include a phone number.

Septic Permit (new installation or repair of existing system) Perc test/soil borings required at time of application.

Driveway Permit and Driveway Deposit Claim Form required for some new homes.

Applications for the City of Chisago City are available on their website and must be submitted to them.

Additional forms required for the following cities:

Center City – zoning approval form required with application – contact Center City

Harris – zoning approval form required to be submitted for any project which may impact setbacks (deck,garage, additions)

Lindstrom – zoning approval form  required to be submitted for any project which may impact setbacks (deck,garage, additions) – survey required and impervious surface calculations for properties within 1000 feet of lakeshore.

MN Residential Building Code

Office Jurisdiction

Building Permits are required for all new construction and most remodeling, alteration and repair work in Chisago County. Demolition permits are also required. This office enforces the building code in all townships of Chisago County, except Lent, as well as the cities of: Center City, Chisago City, Harris, Lindstrom, and Rush City.

A map showing areas in which Chisago County has jurisdiction (PDF) for building permits and inspections is available for your reference. For all other areas, please call that city or township.


Application Requirements

  Most projects require two sets of building plans, and fee payment. The Building Department requires a number of specific items to be submitted with an application for building permit. Incomplete applications will not be accepted. See the New Home Building Permit Checklist page for additional information.


How to Apply

Building permits are not available online. Permits may be secured from the Environmental Services Offices in Center City. Some permits may be applied for through the mail. Rush City and Chisago City residents may apply at their local city office. Due to the fact that applications are in triplicate they will not be faxed. We are open daily from 8 a.m. to 4:30 p.m. except on weekends and holidays. For questions regarding a permit please call 651-213-8372.

Building Specifications within Townships

The minimum square footage for a single family dwelling is 960 square feet on the ground floor. The minimum width for a dwelling is 20 feet. Manufactured housing (mobile homes) are allowed in Chisago County provided they meet all the same criteria as any single family dwelling. All dwellings shall be constructed on-site or prefabricated to meet these dimensional criteria. Additions to manufactured houses shall not be allowed in consideration of those dimensional criteria. Residents within city limits should check with their city office.

Electrical Work

The county does not issue electrical permits, or inspect and regulate electrical work. The Minnesota State Board of Electricity should be contacted at 651-284-5064 if you are doing your own wiring. The State Electrical Inspector, Mark Thoma, may be contacted for electrical inspections at 320-309-9483.Find on-line electrical permits for contractors and/or homeowners.

Foundation Requirements

All residential structures must be placed on a permanent foundation at least 42" below grade, forming a complete enclosure under the exterior walls. Manufacturer’s specifications regarding how to set specific prefabricated homes on a permanent perimeter foundation will be required.

Wells

The county does not issue permits for, nor regulate wells except for the minimum required separation from a septic system. Further information regarding water and wells may be obtained from the Minnesota Department of Health, Wells and Water Division at 651-201-4600.

Setbacks within Townships

Building setbacks vary between zoning districts except for setbacks on public roads, which are as follows:

  • Township Roads – 73 feet from the centerline of the road.
  • County and State Aid Roads – 135 feet from the centerline of the road, except Highway 8 which requires 150 feet from the right-of-way.

Please call this department at 651-213-8372 with a location of your building site, the number or name of the road, the legal description (i.e. Section, Township and Range numbers, or plat name) if you desire more complete information on specific zoning districts, such as side or rear yard setbacks, or see the Zoning Ordinance.

When property is located within a city, contact that city office for setback and zoning information.

Shoreland

Shoreland areas in Chisago County are classified into different categories, and have differing setbacks, minimum lot sizes, frontage requirements. Call this department for more detailed information or see the Shoreland Ordinance.

Contractors

General contractors performing work in one of the townships of Chisago Coutny are required to have a State License from the Minnesota Department of Labor and Industry. You may contact them at 651-284-5034 with questions, or visit their website. Check with individual cities to determine if a city license is required.